fishin4cars
True friends just call me Larkin
I've posted some links to your construction thread about going to bog (Maybe?) keep in mind that you only HAVE to elevate a 1" or 2" above the exsisting pond, just enough for the water to spill over into the pond. You can also use the bog along with and into the construction of the slopes. that will take a little more thought and planning but it's very possible.