Skimmer is in and the contractors are completing the stone patio today. Rain is in the forecast (we have been dry for nearly 2 weeks) and that mat save me a lot of work and water washing rocks, settling dust, etc. Some photos are attached.
Photo 1 The stone work is complete around pond edge.
Photo 2 I have some water circulating to check for leaks in cascade area. Used 4 cans of foam today chasing small leaks. These were not leaks in the liner, it was water finding a shortcut.
Photo 3 Gravel patio in foreground. Gravel will extend around entire pond.
Photo 4 & 5 Underlayment and DGA were placed on soil and compacted prior to gravel placement
Porch project is next, new screens, replace rotted floor joists, new porch decking, new steps, etc.
Still to go on pond, washing all construction dirt out of pond, final plumbing connections, filling with water, planting and stocking.
Photo 1 The stone work is complete around pond edge.
Photo 2 I have some water circulating to check for leaks in cascade area. Used 4 cans of foam today chasing small leaks. These were not leaks in the liner, it was water finding a shortcut.
Photo 3 Gravel patio in foreground. Gravel will extend around entire pond.
Photo 4 & 5 Underlayment and DGA were placed on soil and compacted prior to gravel placement
Porch project is next, new screens, replace rotted floor joists, new porch decking, new steps, etc.
Still to go on pond, washing all construction dirt out of pond, final plumbing connections, filling with water, planting and stocking.