I added another row this morning.....in addition to emergency bog piping surgery. That was fun. Had a dribble coming out of the union joint so as I tried to tighten it more the whole flex pvc pipe that dropped down into the bog came loose from the pipes on the bottom. That sucked. I had to dig and drain the bog and added a solid pvc pipe instead of the flex. But, we’re back up and running and it’s only 9:15 am!Agree with above add another row. I had to add height to my bog wall, about 4 inches over time.
Early bird gets the worm....or in this case...the bogI added another row this morning.....in addition to emergency bog piping surgery. That was fun. Had a dribble coming out of the union joint so as I tried to tighten it more the whole flex pvc pipe that dropped down into the bog came loose from the pipes on the bottom. That sucked. I had to dig and drain the bog and added a solid pvc pipe instead of the flex. But, we’re back up and running and it’s only 9:15 am!
Want to reply to this thread or ask your own question?
You'll need to choose a username for the site, which only take a couple of moments. After that, you can post your question and our members will help you out.