Forums
New posts
Search forums
Showcase
New items
Latest reviews
Search showcase
Media
New media
New comments
Search media
Articles
Latest reviews
Search resources
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Members Area
General Chat
The Good Banter Thread
Reply to thread
Message
[QUOTE="Big Lou, post: 161955, member: 5066"] I was exaggerating ladies because the contractor is taking so long. On average they are here 1.5 days a week. That equates to 0 days some weeks. Two to three others. Very frustrating to say the least. STATUS FINISHED - south and west property line beds, behind the pond bed, pond stone rearranged, side neighbor cedar fence, front of pond bed, corner cedar trellis on northeast corner of pond deck, main deck stabilization (unsuccessful). PARTIALLY FINISHED - north side of pond planting/back ledge stone, curved bed running along both little deck and walkway, driveway/walkway corner bed, corner of house tree/boulder bed, 5 of 8 trees trimmed. NOT STARTED - Cathy's special lily bed, 4 small areas of St. Augustine sod, stone border around mawmaw's lily bed, French drain along fence, walkway entrance from driveway pergola, driveway sanding, driveway staining, garage door painting, natural fertilizing, replace dead rose. [/QUOTE]
Verification
Post reply
Members Area
General Chat
The Good Banter Thread
Top