mrsclem
mrsclem
- Joined
- Jul 21, 2008
- Messages
- 5,490
- Reaction score
- 4,959
- Location
- st. mary's county, md.
- Hardiness Zone
- 7A
- Country
Hate to start a thread for something I should probably know but------
new liner installed yesterday over existing liner. Middle pond in a step down set-up. bog flowing to new pond to main pond. New section is 10x2x2 wood framed. Liner dropped in yesterday and 8" of water put in to try to get liner in to position. Today filled up to within 2" of top (still have to put in spillway). How soon can I anchor this liner? Top is rolled up on to bog area, sides anchored with bricks and bottom edge hanging into main pond. Temps 95+ so I'm thinking tomorrow?
new liner installed yesterday over existing liner. Middle pond in a step down set-up. bog flowing to new pond to main pond. New section is 10x2x2 wood framed. Liner dropped in yesterday and 8" of water put in to try to get liner in to position. Today filled up to within 2" of top (still have to put in spillway). How soon can I anchor this liner? Top is rolled up on to bog area, sides anchored with bricks and bottom edge hanging into main pond. Temps 95+ so I'm thinking tomorrow?